Can You Create a Construction Risk Register With AI and Structured Records?
Stop maintaining a document and start reading the records you already keep. What structured records plus AI can do for a risk register, and what they can't.
Timesheets v Allocation Sheets: Why Your Payroll Data Isn't Commercial Evidence
A timesheet says Sarah worked 10 hours. An allocation sheet says what she did and proves it. Under the Schedule of Cost Components, only one gets you paid.
Will AI QSs Kill Off the Graduate Quantity Surveyor?
Graduates are hired to do the work that builds judgement. AI now does that work in seconds. The case for and against, and how firms should rebuild training.
AI Image Tagging: Turning Your Site Photo Chaos Into Evidence
AI image tagging turns an inbox of jpegs into a searchable, timestamped record. The engines underneath, the four tool categories, and the accuracy trap.
For Record Purposes Only: Why NEC Doesn't Need Client Approval of Your Records
A client asks to approve your weekly records before they go out. NEC has no such mechanism. Why acceptance and approval are different, and what to say.
OpenAI Just Gave ChatGPT a Job. Should It Have Yours?
ChatGPT Work takes a goal and returns a finished document. Here is what it really does, the rollout catches, and how it stacks up against Copilot and Claude.
The real cost of a missed compensation event. Clause 61.3 closes in eight weeks. If the event is not on the diary that day, the notice often never goes.
Five advantages of a bill of quantities: comparable tenders, clearer valuations, fewer variation fights. The bill is only as honest as the quantities written down on the day.
S-Curves in Construction: The Project Manager's Guide to Tracking Progress
How to read, build and use construction S-curves: the formula, planned vs actual, CPI/SPI, and why the site diary behind the curve is what lets a QS plot earned value.
Earned Value Analysis: 10 Essentials for Construction Projects
Earned value analysis compares planned, actual and completed work to show whether a job is on programme and on budget. Ten formulas, from BCWS through EAC, with a worked example.
Project 13 & Site Records for Infrastructure Success
Project 13 is the ICE enterprise model for infrastructure. What it is, how owners and suppliers work as one team, and why the daily site record still decides whether you get paid.
NRM2, CESMM4, SMM7: UK Construction Measurement Standards Compared
NRM2, CESMM4, SMM7, MCHW and RMM compared. Which UK measurement standard applies, what SMM7 still means on legacy jobs, and why the measure only holds if the site record is complete.
Gather sponsors NEC People Conference 2025 in London. Ben Walker presents on NEC4 commercial discipline and structured recordkeeping for infrastructure projects
Daily Allocation Sheets: Construction's Most Underrated Document
The daily allocation sheet is underrated. Names, hours and the activity, written that shift. Reconstruct it on Friday and Defined Cost becomes a guess.
Critical Path Method Definition, Analysis Benefits & How to Do It
The critical path method is the longest chain of activities that sets the finish date. How to build a CPM, what float means, and why a revision is only honest if progress was written that day.
A construction site diary is the daily record of what happened on site. What to write, who should write it, and why a reconstructed week will not stand up when a claim is challenged.
Construction Records & Information Management System - Gather Insights
Construction records management is more than a site diary. Photos, allocations, instructions and notices have to sit together, or the QS reconstructs the week from WhatsApp.
Contemporaneous Records: If You Can't Prove It, You Won't Get Paid
Contemporaneous records are written when the event happened. Meaning, examples, and why a reconstructed week will not stand up when a construction claim is challenged.
Measured mile analysis compares a clean stretch of work with a disrupted stretch of the same activity. Formula, two worked examples, and why the numbers collapse without a diary kept on the day.
CEMAR founder Ben Walker joins Gather as commercial director. Why the person who helped draft NEC4 is now working from the site record, not another contract tool.
Download the free 2025 Network Rail calendar. Thirteen four-week periods, not calendar months. Miss a period end and the payment or possession waits another four weeks.