Gather.
On the record.
The facts, files and people behind Gather. Download our press pack or pick the assets you need below.
The right logo.
Ready to download.
Original artwork, with transparent backgrounds. Choose SVG for scalable artwork or PNG for everyday use.
Favicons & app icons
The Gather symbol in two ready-to-use sizes. Both PNG files have transparent backgrounds.
Full colour
color.png · 192 × 192 · transparent
White / transparent
outline.png · 32 × 32 · white only
Gather, in a few words.
Company copy for articles, introductions and event listings.
Gather is a construction Record Management System (RMS) that helps teams capture daily activity, resources, progress and supporting evidence, then use those records in project reporting and commercial review.
Gather is a construction Record Management System (RMS) built around the practical needs of site and commercial teams. It connects daily activity, labour and plant, progress, events and photographs in a structured project record. Teams use that evidence for reporting, progress review and the substantiation of change. Its QS AI Agent helps review records and flag matters for the project team to examine. Founded by chartered quantity surveyor Will Doyle as Raildiary in 2016, the business adopted the Gather name in 2024 as its work extended beyond rail. Gather is based in Manchester, United Kingdom.
- What we do
- Construction Record Management System
- Founded
- 2016, as Raildiary
- Gather name adopted
- 2024
- Founder & CEO
- Will Doyle
- Based in
- Manchester, United Kingdom
- Legal name
- Gather Insights Limited
- Company number
- 10215108 · England & Wales
- Website
- gatherinsights.com
Built by a QS
who lived the problem.

Will Doyle
Founder and CEO · Chartered quantity surveyor
Will Doyle is the founder and CEO of Gather and a chartered quantity surveyor. He founded Raildiary in 2016 after experiencing how difficult it was to retrieve reliable site evidence for commercial work. The business became Gather in 2024 as its work expanded beyond rail. Will speaks on construction records, commercial management and the practical use of AI in quantity surveying.
Available for commentary on
- Construction records and commercial evidence
- Practical AI for quantity surveyors
- NEC contracts, change and compensation-event evidence
- Building construction technology from site experience
“I built Gather because I was sick and tired of terrible, terrible records.”
Will Doyle · The story behind Gather
Show the product.
Tell the story.
Product screenshots with captions and credits. For a current demonstration or imagery for a specific story, contact us.


Combined shift report
Caption: Gather combined shift report selection. Credit: Gather.
The company story
From Raildiary to Gather, and why better site evidence matters.
Read our storyCustomer stories
Published accounts of how construction teams use Gather.
Explore customer storiesNEC & commercial insight
Our webinar library for construction and commercial teams.
Browse webinarsA few useful essentials.
Keep it recognisable.
Keep the logo’s original proportions and colours. Give it clear space, choose a contrasting background, and avoid stretching, redrawing or adding effects.
Write Gather in running text. Use Gather Insights Limited where the legal company name is needed. “Raildiary” refers to our former name.
Can I use these assets in an article?
Use the supplied logos, founder photograph and product screenshots for editorial coverage of Gather. Credit images to Gather. For advertising, endorsements or other uses, contact us first.
Which logo format should I choose?
SVG is vector artwork: use it for print, large layouts and sharp scaling. PNG is a transparent image: use it in presentations, articles and other tools that require raster files.
What is inside the full press pack?
Four logo variants in SVG and PNG, two favicon PNGs (192 × 192 full colour and 32 × 32 white), Will Doyle’s photograph, two product screenshots, a PDF fact sheet, plain-text company descriptions and founder bio, and a read-me with captions and usage guidance.
How do I arrange an interview or speaking slot?
Email Will with your publication or event, topic, format and deadline. For speaking requests, include the proposed date and audience.
Working on a story?
For interviews, expert commentary, speaking requests or additional imagery, get in touch with Will.
will@gatherinsights.com