Gather unlocks the power of digital transformation for Cubby Construction
Cubby Construction has selected Gather’s software as their solution of choice, signifying a commitment to transform their site reporting and unlock huge productivity opportunities for their team and clients. This strategic decision by Cubby is already yielding substantial benefits: enhancing efficiency, streamlining workflows, and optimising data management across a range of prominent construction projects.
Cubby Construction has seamlessly deployed Gather software into several ongoing projects, showcasing its versatility in diverse construction endeavors. From the strategically critical Carlisle Southern Link Road project, addressing flooding risks with a comprehensive 44km drainage system, to the refurbishment of 119 lakeside apartments in Phase 6 of the Center Parcs project, Cubby Construction demonstrates a commitment to innovation. Other significant projects, such as the Tullie redevelopment, DPD Exchange Hub service works, and the St Mary's School gymnasium extension, underscore the widespread adoption of Gather software. Its role in these projects ranges from streamlining data management and documentation to optimising resource allocation and project planning.
Cubby Construction's decision to adopt Gather software was motivated by its capability to centralise information consistently, providing a streamlined approach to data management. This move has significantly improved efficiency by automating report generation, reducing administrative burdens, and ensuring accuracy. Stuart Walker, COO at Cubby Construction, emphasises the software's value in change management, stating, "The adoption of Gather software has had a profoundly positive impact on collaboration and communication among team members involved in construction projects at Cubby Construction." The real-time data access has eliminated cumbersome paperwork, enhancing transparency, simplifying record-keeping, and empowering the team to set and achieve targets for production and outputs. Gather software has proven to be a key ally in driving overall productivity for Cubby Construction. Gather CEO William Doyle added, "Working with Tommy and Stuart at Cubby has been an absolute pleasure. Together, we've harnessed the transformative capabilities of Gather software to elevate their projects, from optimising resource allocation to streamlining project planning. It's truly gratifying to witness the positive impact on productivity, and we look forward to continuing this successful partnership."
As Cubby Construction and Gather deepen their collaboration, the impact on the UK construction industry becomes increasingly evident. This strategic partnership is setting new standards in project management, promoting efficiency, transparency, and innovation. With the integration of Gather software, Cubby Construction looks towards a future of streamlined operations, optimised resource allocation, and continued success in delivering high-quality construction projects.