Plan
Programme & Budget Import
Left in site cabins, damaged by rain, illegible.
No photos, GPS, or timestamps. Won't hold up in a dispute.
QSs spend weekends copying data into spreadsheets.
20+ minutes per record. Supervisors abandon them.
Useless in tunnels, basements, and remote sites.
Typing with cold fingers and gloves? Not happening.
"We used to update our team on our completed works via Microsoft Teams or WhatsApp groups. We had separate processes for monitoring resource and labour and two different forms that needed to be filled out. Gather has put everything in one place for us."
Construction Manager, Amey
We come to your site and train supervisors on their actual devices. Not a webinar. Real training.
One person who knows your project. Not a ticket queue.
Phone, email, or video. We're here when you need us.
We track usage by gang and supervisor. If it drops, we proactively reach out before it becomes a problem.
8 steps. Under 5 minutes. Up to 64% pre-filled from yesterday's data, your programme, and weather APIs.
"Gather is a link between the day team and the night team. The diary is prepared by the staff on days planning the jobs and passed on to the night team who execute the plan. Information is stored in one place. Everyone is sharing the same information. No desktop saving."
Senior Project Manager, Balfour Beatty
"Gather eliminates the 'he said, she said' from the conversation. With quality, well-rounded data from site, we can now communicate calmly using facts and compare our productivity target to actual delivery."
Director - Cubby Construction
Data flows automatically to the rest of the platform. No re-entry.
They won't. That's the point.
Gather is built for site, not office. Voice entry means no typing with gloves on. Pre-filled fields mean 64% of the record is done before they start. Most supervisors complete their first shift record in under five minutes. We also come to site to train your team on their actual devices. No webinars, no PDFs. Real hands on sessions with your people, your kit, your sites. And we track adoption daily. If usage drops, we'll call you before you notice.
Gather works fully offline. Tunnels, basements, remote sites, wherever. Your supervisors complete their records as normal. Data queues locally on the device. When they get signal (even briefly), everything syncs automatically in the background. Photos and voice notes upload without them lifting a finger. They'll never lose a record because they were underground.
Yes. Every field is configurable to match your processes. Add custom dropdowns for delay categories, equipment types, or activity codes that match your WBS. Remove fields you don't need. We set this up during onboarding based on your existing templates. If you're using specific codes for NEC alignment or internal reporting, we'll mirror them exactly.
However you need it.
We are building native integrations with CEMAR, Procore, and Power BI. Data flows automatically without manual exports or uploads. For custom workflows, our open API is fully documented. We also support MCP connections, so your team can query project data directly through Microsoft Copilot and other AI tools. And yes, you can still export to Excel with one click. Some things never change.
Hosted on ISO 27001 certified infrastructure with UK data residency.
Role based access means your supervisors only see their sites. Audit logs track every change. We're Cyber Essentials Plus certified and regularly penetration tested.
Your IT team can review our security documentation before you sign.
Book a demo and we'll show you exactly how Gather works for your projects. No slides. Just the product.
During the shift, the team was engaged in the cable containment installation (C19) at location CH1/235 under HV works. The planned scope was to complete 60 metres of installation. However, progress was halted after 30 metres due to the discovery of an unexpected live cable within the excavation area. For safety reasons, work was immediately stopped to prevent any hazards. The variance falls under 'Unexpected Physical Conditions.' Further assessment is required before resuming activities to ensure safe continuation of works.