Gather Record · Construction site diary software

Record the work.
Keep the proof.

Capture daily progress, changes, photos and resource hours in one construction site diary. Give your commercial team the detail to review what happened.

Book a demo

Record offline. Dictate notes. Attach photos.

Used by site and commercial teams at

Network RailAmeyBalfour BeattyCostainMurphySiemensCubbyCircetNG BaileyDywidagGround Control

EXPLORE A SHIFT RECORD

Three inputs. One clearer picture.

Select a part of the record to see where it goes.

Sheet piling Structure 1S/FQ · Example shift
Progress against plan75 m / 100 m planned
Recorded changeGround obstruction 09:45 · 2 h 30 min
Resources allocated14.5 h labour + 8.5 h plant
01 / PROGRESS

Compare completed quantities with the plan, activity by activity.

Explore progress

Illustrative shift data. Select any input or the report to explore.

A shift in Gather

What goes into your site diary.

The team completes 75 m of a planned 100 m. Here’s how the diary connects that shortfall to an obstruction and the resources on site.

‹   Shift record✓ Synced

Worklog

Activities

Location
Structure 1S/FQ
Discipline
Civil Engineering
Activity
Sheet Piling
PLANNED100 Metre
ACTUAL
75 Metre-25
25 m below planSee the recorded interruption alongside this activity.

01 / Progress

See exactly where work stands.

Enter completed quantities against the activity and location. The next shift starts with a clear view of what remains.

‹   Shift record✓ Synced

Events

Activities

DELAY EVENT
Time
15-01-2026 • 09:45
Duration
2h 30m
Location
Structure 1S/FQ
Description
Sheet piling halted due to unexpected ground obstruction at 4.2m depth. Awaiting geotechnical assessment.
Illustrative construction-site photograph from the existing Gather visual
Photo attachment · illustrative image

02 / Events

Keep the reason with the record.

Add the event, timing and photos while the detail is fresh, so a later review has more to work with than memory.

‹   Shift record✓ Synced

Hours Allocation

Structure 1S/FQ - Sheet Piling
Civil Engineering

People

Adam Barnes
Piling operative
8.5h
Sarah Mitchell
Site engineer
6.0h

Equipment

JCB 3CX Backhoe
Plant allocation
8.5h

03 / Resources

Account for the hours on site.

Allocate labour and plant hours to each activity. Your commercial team can trace the resources used to the work recorded.

Illustrative product views with example data.

04 / Reporting

Start the review with the evidence.

Gather Report brings the shift records into one view, ready for your team to investigate differences and assess their commercial significance.

Explore Gather Report →
NorthWest Infra / Civils PackageIllustrative shift report

SHIFT RECORD · 15 JANUARY 2026

Sheet piling — Structure 1S/FQ

Example record

Progress against plan

Planned100 m
Recorded75 m

25 m below plan · 75% recorded

Resources allocated to the activity

Adam BarnesPiling operative8.5 h
Sarah MitchellSite engineer6.0 h
JCB 3CX BackhoePlant8.5 h

Recorded interruption

09:45 · Duration 2 h 30 min

Sheet piling halted due to unexpected ground obstruction at 4.2 m depth. Awaiting geotechnical assessment.

Illustrative construction-site photograph from the existing Gather visual
Photo attachment · illustrative image

Recorded hours are activity allocations, not a calculation of delay cost.

Quantities, resources and the event in one review Example data · illustrative report layout
Illustrative report summary using the same example shift shown above.
Spot differences in progressSee which activities delivered the planned quantities and which need attention.
Understand what happenedRead the events, comments and resource allocations behind the figures.
Support the commercial assessmentUse the evidence alongside the programme, contract and cost records.

Using Gather Record

Before your first shift.

Setup, daily use and sharing records.

Can we record a shift without a signal?

Yes. Gather supports offline shift recording, with data saved on the device and synced when a connection returns.

How much does the site team need to type?

Pre-filled shift information reduces repeat entry, and voice-to-text lets teams dictate notes. They check the details, record progress and changes, and add photos.

Can we use our own activities, codes and fields?

Yes. Configure fields and dropdowns around your activities, locations and reporting needs. Bring your current diary or allocation sheet to the demo so we can show how it would work in Gather.

Does it record labour and plant hours as well as progress?

Yes. Teams record quantities against activities and locations, then allocate labour and plant hours to the work. Events and photos provide the context behind differences between planned and actual delivery.

Can the office export and share the records?

Yes. Gather supports branded shift PDFs and summary reports, with PDF and CSV exports. The same site data feeds Gather Report, so the office can review progress and resource use.

What help do we get with rollout?

We support project setup, team training and ongoing use. On-site training is available, alongside support by phone, email and video. We’ll agree the training and support needed for your rollout.

Where can our IT team check security?

Gather supports Microsoft single sign-on and two-factor authentication. Your IT team can review data handling, access controls and security documentation in our Trust Centre.

Choosing site diary software

What to look for in site diary software in the UK.

A site diary is only as useful as the record it leaves behind. Use these three checks when you compare site diary apps for a UK infrastructure project.

Entries made on the dayLook for an app that works offline, timestamps entries and photos, and lets the team dictate notes, so the record is made on the shift and not rebuilt later.
Progress, hours and events in one recordCheck that quantities, labour and plant hours, events and photos sit together, so the office can read what happened against the plan without chasing spreadsheets.
Records the office can useLook for PDF and CSV exports, shared reports and single sign-on, so commercial and project teams review the same records and your IT team can check access.
Book a demo

Gather Record is built around these checks. Bring your current diary, or start with the free site diary template.

See it with your team

Bring your current site diary.

See how your team can record progress, changes and resource hours in Gather.

Book a demo A 30-minute walkthrough.

Watch Gather in action

Gather · Product walkthroughWatch on YouTube ↗