The Construction S-Curve Template That Actually Forecasts Outturn

A free Excel template for planned value, actual cost and earned value. Enter your baseline and actuals, and it calculates CV, SV, CPI, SPI and a full EAC/ETC/VAC forecast automatically. Built by quantity surveyors, not a generic project template.

Excel (.xlsx), 3 sheets
Ready to use in 10 minutes
Includes a worked £2.4m example
What's inside

Three tabs. Nothing you don't need.

Most S-curve templates online are either too basic to forecast anything, or so bloated with macros they break the first time someone opens them in a different version of Excel. This one has three tabs and no macros.

  • ✓How to use. A five-step guide: set the job basics, enter your baseline, add actuals, read the curves, use the forecast.
  • ✓S-Curve Calculator. The blank template. Enter Budget at Completion, number of periods and your planned % complete by period, then log actual cost and actual % complete as the job runs.
  • ✓Worked Example. A fully filled 12-month, £2.4m job with realistic construction milestones, so you can see exactly how the formulas behave before you touch your own numbers.
  • ✓Automatic forecast block. CPI, EAC, ETC, VAC and TCPI calculate themselves from your data date. No separate spreadsheet, no manual maths.
How it works

Enter three things. Get the full EVM picture.

You enter cumulative planned % complete, cumulative actual cost and cumulative actual % complete for each period. The template does the rest.

Planned value

PV, from your baseline

Planned % complete converted straight into a cumulative £ curve against Budget at Completion. There's an ideal-curve helper built in if you need a sensible starting shape before you refine it to your actual programme.

Actual cost

AC, from your cost records

What you've actually spent to date, cumulative. Pulled straight from your CVR or cost ledger, not estimated.

Earned value

EV, from site progress

Actual % complete converted to a £ value of work actually done. Compare this against PV and AC and you've got the three curves that tell the whole story.

CV / SV
Cost and schedule variance, in £
CPI / SPI
Cost and schedule performance index
EAC / ETC
Forecast final cost and cost still to come
VAC / TCPI
Forecast variance and efficiency needed to hit budget

Negative cost or schedule variance, and a CPI or SPI under 1, are flagged automatically so you're not hunting through a wall of numbers to find the problem period.

Worked example

See it running on a real £2.4m job first

The Worked Example tab is a 12-month, £2.4 million job, mobilisation through practical completion, with the sort of milestones you'd actually see on site: mobilisation, groundworks, a peak month, fit-out, practical completion.

At month 9, the data date in the example, actual cost has run ahead of earned value. CPI sits at 0.96 and SPI at 0.99. Run that through the forecast block and the job is heading for roughly £2.5m against a £2.4m budget, about £102,000 over. That's the point of an S-curve. It tells you there's a problem in month 9, not in the final account meeting in month 14.

Copy the structure straight across into your own tab once you're comfortable with how the formulas move.

Get the template

Download the template. No form, no email.

Free download. No card, no email, no obligation. Just a working S-curve template you can put your own numbers into today.

Download the Excel template

Excel (.xlsx), 3 sheets. Yours to use and share with your team.

Every period, someone has to update this by hand.

Actual cost and actual % complete don't fill themselves in. Somebody pulls them from the cost ledger and the site diary, types them into the yellow cells, and does it again next period. Gather's AI QS agent reads every site diary entry and links it to cost and progress data automatically, so the numbers behind your S-curve update themselves instead of waiting for the next manual review.

Book a demo
FAQ

Frequently asked questions

Does this work for JCT as well as NEC contracts?

Yes. Earned value forecasting isn't contract-specific. The template tracks planned value, actual cost and earned value regardless of the form of contract you're running.

Do I need to know EVM to use it?

No. The How to use tab walks through the five steps, and the Worked Example tab shows exactly how a finished, live version behaves before you build your own.

Does it work in Google Sheets?

It's built and tested in Excel. Most of the formulas will import into Google Sheets, but check the forecast block calculates correctly after import.

Can I use it for more than one project?

Yes. Duplicate the S-Curve Calculator tab for each project, or duplicate the whole file. There's no licence restriction on internal use.

Thanks! Your download link is below. Grab the S-curve template here.
Something went wrong. Use the direct download link above instead.

An S-curve is only as honest as the diary behind PV, AC and EV. Keep the site diary current. Rosie reads those entries so the curve is not three unreconciled files.