1Gather: the commercial recovery specialist
Let us be straight about what Gather is and is not, because credibility is the whole point of a page like this.
Gather is not a generic forms platform. If all you want is to digitise paper checklists and safety forms across a large field team, Sitemate or Novade will serve you better on breadth of templates and form flexibility.
What Gather is: the AI site-diary and commercial-record layer built specifically for UK contractors on NEC. Its AI reads every site diary entry against your contract terms and flags the compensation events a manual review misses. In practice, manual diary review catches about 60% of legitimate change events. The other 40% is revenue that quietly leaks away because nobody spotted it before the notice period expired.
Gather was built by people who lived this. Will, our founder, nearly lost £20 million on the North West Electrification Programme because the records existed but were scattered across emails, spreadsheets, site vehicles and a supervisor's notebook nobody could find. Ben Walker, who helped draft NEC4 and founded CEMAR, is on the team.
Where Gather beats Sitemate: native NEC4 alignment, AI compensation-event detection (around 40% more CEs than manual review), eight-week time-bar tracking, a QS-first rather than field-first design, and a founding team that has drafted NEC4 and lost money to the exact problem it solves.
Where Sitemate beats Gather: breadth of generic form templates (100+), a longer-established no-code form builder, and a broad field-documentation feature set for teams whose priority is digitising paperwork rather than recovering claims.
Many contractors run both. A field tool for the paperwork, Gather for the commercial recovery. They are not mutually exclusive.