For Contractors who are done with the chaos

You know the drill.

Five tools. Sunday nights. Scrambled diaries.

Your site diary made simple.

One platform for planning, recording, and reporting. Built for site teams who don't have time, signal, or patience for any of it.

Request a Demo

One third of every project budget ends up in dispute.

And the contractors who lose share one thing in common: they couldn't prove what happened. Not because they didn't do the work. Because they didn't have the records.

The "Evidence Void"

Critical updates trapped in WhatsApp and Excel. When a compensation event arises, you lack the contemporaneous evidence to prove the impact.

£

Unrecoverable Costs

Late or generic diaries fail audit tests. This leaves you exposed to disallowed costs and unable to verify actual spend against the contract.

Adversarial Accounts

Without a shared source of truth, final accounts become a negotiation based on opinion, not fact. The result? Expensive adjudication.

The construction industry loses billions annually to disputes, delays, and administrative inefficiency. Most of it is preventable.

0 weeks

NEC4 Time Bar

Miss the notification window and your entitlement disappears. Regardless of merit.

0%

Root Cause

"Inadequate contract administration" cited as the primary cause in half of all UK adjudications.

Adjudication Society 2024

0 hrs

Monthly Admin

Average time QSs spend consolidating spreadsheets for CVRs. Three full days every month on admin.

"

Contemporaneous records will always provide the most reliable evidence.

Walter Lilly v Mackay — the rule courts still follow.


When your records conflict with your testimony, the records win. When you have no records, you lose.

Capture it once. Use it everywhere.

Gather turns your daily site records into the evidence that substantiates valuations, protects entitlement, and wins future work. Five minutes per shift. Commercial certainty for years.

Request a Demo

Your programme becomes your progress tracker.

Import your existing schedule or build one in Gather. Either way, your team clicks a task and the diary entry writes itself with activities, resources, and locations pre-filled from the plan.

  • 64% of fields pre-populated from your programme

  • One-click diary creation from any scheduled task

  • Real-time sync between plan and actual progress

Who uses it:

Site Engineers Planners Project Managers

Why it matters:

Stop copying information that already exists. When your foreman records progress, Gather knows exactly what was planned, making compliance documentation effortless.

Request a Demo

Programme View

Week of 20 Jan 2025

Activity
Mon20
Tue21
Wed22
Thu23
Fri24
Southam Road 2
Track Inspection
80%
Track Inspection3d
64% Pre-filled
Signal Testing
20%
Signal Testing3d
Lumbs Lane 2
Site Preparation
60%
Site Preparation4d
Excavation Works
0%
Excavation2d

Create Shift Record

Thu 23 January • Track Inspection

64%

Pre-filled

8

Fields ready

Planned Activities
1

Track Inspection

Linked to BoQ 4.2.1

Site Preparation

Linked to BoQ 2.1.3

Record

The site diary your field teams will actually use.

Paper diaries get lost. Spreadsheets get ignored. Gather's mobile app takes five minutes per shift and works offline, so site teams capture structured, contemporaneous records every single day without the friction.

  • Loved by field teamsVoice to text, offline capture, and a UI designed for gloves and rain. Rated #1 for ease of use.

  • Replaces paper diaries completelyEvery shift generates a professional, timestamped, GPS tagged record ready for audits and disputes.

  • Contemporaneous by defaultRecords captured at the point of work, not reconstructed weeks later from memory.

Who uses it:

Site EngineersForemenQuantity Surveyors

Why it matters:

When a dispute reaches adjudication, the side with contemporaneous records wins. Gather ensures your teams create that evidence automatically, every shift, without extra effort.

Request a Demo
NorthWest InfraCable Upgrade01-03 Tom Wilson
Submitted
1
2
3
4
5
6

Shift is Submitted

Submitted 02-03-2025 · 07:15

Tom Wilson

1

Shift Information

2

Access Information

3

Resource Information

4

Worklog

5

Shift Comments

6

Hours Allocation

1. What are the shift timings?

Start Time

01-03-2025 21:00

Shift Duration

9 Hours

End Time

02-03-2025 06:00

Access Point

Ruislip · West Compound
Weather

Temperature

6 °C · Overcast

Wind

Light breeze

2. Access Information

Planned vs Actual with variance tracking

On Track Equipment
Planned01-0322:25
Actual01-0322:25
On time
Works Commence
Planned01-0323:00
Actual01-0323:30
+30 min
Works Complete
Planned02-0304:00
Actual02-0304:00
On time
Reason for variance:Delay at RRAP

3. Resource Information

People and equipment on shift

People · 4
NameRoleSupplier
Hartley DeanCOSSAmco Giffen
Danny BrownForemanAmco Giffen
Mark NeilsonGroundworkerStory
Nicky SkinnerEngineerColas Rail

4. Worklog

Activities, quantities, and events

LocationActivityPlannedActual
CH1/235Cable Containment Install60m30m
Reason for variance:Excavation had unexpected live cable. Work stopped for safety.

5. Shift Comments

Notes, safety issues, and deliveries

Shift Comments

Team engaged in cable containment installation at CH1/235. Progress halted after 30m due to discovery of unexpected live cable. Work stopped for safety. Variance category: Unexpected Physical Conditions.

01-03-2025 22:00
Deliveries · 2
SupplierPO No.Received
A1 AggregatesPO-78432Tom Wilson
JewsonPO-78451Tom Wilson

6. Hours Allocation

Allocate hours for each resource

People
NameRoleHrs
Hartley DeanCOSS9
Danny BrownForeman9
Mark NeilsonGroundworker9

Hartley Dean

Total

9.00

Allocated

5.00

Remaining

4.00

Report

Manage by data, not by gut feel.

Stop waiting until month end to see your numbers. Real time dashboards show productivity, cost, progress, and resources the moment site teams record them. When the board asks questions, you answer with evidence, not estimates.

  • Data led decisionsSee variances as they happen, not weeks after they've cost you money.

  • One source of truthEvery dashboard pulls from the same structured records. Numbers that never contradict.

  • CVR built on evidenceCost data flows automatically from site records to cost codes. Always current, always defensible.

Who uses it:

Project Managers Quantity Surveyors Project Directors

Why it matters:

When leadership asks how the project is tracking, you pull up a dashboard instead of scrambling through spreadsheets. Real time visibility turns reactive fire fighting into proactive management.

Request a Demo
WorkspaceA1 Cable UpgradeKey Insights

Shift Records

1,258

+12%

Avg Shift Score

87

+7%

Access Score

92.8

+4.2%

Lost Time

124.5h

8%

Shift Performance Overview

Productivity Score
85
150 120 80 40 0 0 40 80 120 160 Shift Productivity Score

QS AI Agent

Every event. Every clause. Caught in time.

The AI reads every diary entry, understands your contract, and surfaces commercial opportunities before notice periods expire. It spots the compensation events your team didn't recognise.

  • 100% of records analysed in real time

  • Early Warnings and CEs flagged automatically

  • Draft notices with clause references ready to review

Who uses it:

Quantity Surveyors Commercial Managers Contract Managers

Why it matters:

Your site team sees "revised drainage layout" and files it away. The AI recognises it as a change to the Works Information under clause 60.1(1), calculates the impact, and tells you exactly what to do next.

Request a Demo

QS AI Agent

Analysing 1,258 records

Live

1,258

Records Reviewed

5

Early Warnings Suggested

12

Actions Recommended

Compensation Events Requiring Action

3 new
Change to Works Information – Drainage Revision
60.1(1)Notice due in 6 days
CE
Unforeseen Ground Conditions – Rock Stratum
60.1(12)Notice due in 4 days
CE
Late Provision of Survey Data – Section B
60.1(5)Notice due in 2 days
CE
No rip and replace

Integrations that
actually work

Gather sits on top of your existing CDE stack. Connect everything. Break nothing.

Microsoft Copilot & 365

Native Add-in & Intelligence
  • Query site data via Copilot
  • Connects with Excel & Power BI
Coming Soon

Procore

Two-way Sync
  • Sync Daily Log entries
  • Push RFI drafts

Contract Management

CEMAR, Contract Bee & Others
  • Push Early Warnings directly
  • Substantiate Notices
Coming Soon

Autodesk

Direct Link
  • Sync issues & photos
  • Centralise site records
Plus connections with
Thinkproject Aconex Viewpoint Fieldwire And more...

Don't see your system? Try our public API or MCP.

Request a Demo

Common questions

Everything you need to know before getting started.

Excel / PowerBI
MCP Server
Aconex
Construction worker in orange safety vest and blue hard hat standing on a railway track with construction machinery in the background.

"I built Gather because I was sick and tired of terrible records."

Before Gather, I spent 10 years on site. Every month ended the same way: chasing foremen for missing diaries, arguing with clients over unproven variations, and losing entitlement because we couldn't prove what happened 6 weeks ago.

I knew there had to be a better way than wet notebooks and Excel spreadsheets. So I built it.

William Doyle
Founder & CEO