In this month's update, we have improved our Fatigue Risk Assessment email. Expect an even more comprehensive and insightful overview of your Shift Record directly within the email itself. This is great because it saves you the hassle of opening up shift properties to access crucial information related to a Fatigue Risk Assessment.
Additionally, we have some exciting updates coming soon to the platform, unlocking even more powerful features for you to explore. Stay tuned!
Here are some of our most exciting updates in the pipeline:
- Enhanced Labour Control
- New Labour Cost Report
- Calendar View
Fatigue Risk Assessment Email
The content of the Fatigue Risk Assessment email has been updated to include important changes.
The email now provides comprehensive information about the related Shift Record, incorporating details about agreed-upon actions, a convenient direct link to access the Shift Record and reports as well as the corresponding risk score. It's important to note this email maintains a strong focus on security and privacy, as no personal information is included in its contents.
✅ Detailed overview of Risk Assessments.
✅ Proactive Fatigue Management.
✅ Easy and efficient shift information.
![](https://cdn.prod.website-files.com/6643a121702c94e7969ec871/6643a121702c94e7969ed623_Fatigue%20Email%20%20(1).png)
Improvements
Dashboard Reports in Key Insights
These reports now include more information about where exceedances or risks occur, to offer a better explanation.
New Inline Permission for Project Level Key Insights
A new permission to allow or deny access to Project Key Insights, leveraging control over dashboard access wherever needed.
🥁Coming up…
![](https://cdn.prod.website-files.com/6643a121702c94e7969ec871/6643a121702c94e7969ed611_calendar%20(1).png)
Calendar View
Get ready to be amazed by our brand-new calendar view! Easily organise and streamline your shifts by filtering them by day, week, or month.
This feature allows you to effortlessly view and manage past, present, and future shifts, enhancing your shift management capabilities. Additionally, each shift is colour-tagged based on its status, ensuring that your records are always up to date and never miss a submission.
✅ Visual clarity and accuracy.
✅ Streamlined shift management.
✅ Efficient shift organisation.
![](https://cdn.prod.website-files.com/6643a121702c94e7969ec871/6643a121702c94e7969ed627_labour-updates.png)
Enhanced Labour Control
Managing hundreds of different people, labour suppliers and roles should not be a hassle. We are changing how this works in Q3, allowing you to create an enhanced labour profile for each person, including key attributes, rates, roles and determining which projects they can work on
✅ Manage labour teams centrally at scale.
✅ Reduced input for site teams.
✅ Real-time labour costing.
Labour Cost Report
In light of enhanced labour control, which encompasses the incorporation of new labour rates, we are actively in the process of designing a corresponding report to integrate with these changes.
Introducing the Labour Cost Report - a meticulously crafted document outlining the details of the rates attributed to each worker across the organisation, presenting a holistic perspective of project costs.
By detailing the diverse rates assigned to individual team members, this report serves as a pivotal tool for streamlining labour cost administration and empowering well-informed decision-making processes.
✅ Compliance and Reporting.
✅ Rates are readily available to share with team members.
✅ Conduct cost analysis at WBS level.