Resources / Project controls templates
Free templates · Project controls

Construction Project Controls Templates (Free Excel Downloads)

Nine Excel templates covering the full project controls cycle: programme, earned value, cost forecasting, changes and reporting. Built by the quantity surveyors and planners behind Gather. Direct download, no form to fill in.

Project controls is the set of disciplines that keep a construction project's cost, time and scope aligned to a baseline throughout delivery, covering programme monitoring, cost and earned value reporting, change management and progress reporting so deviations are caught while they are still recoverable.

The templates in this pack

S Curve Template

Plot planned vs actual progress as a classic S curve from your programme data.

PlanningView template
EVM Calculator

Work out CPI, SPI, EAC and ETC from your cost and progress data.

Earned valueView template
Construction Progress Report Template

Turn daily diary entries into a weekly progress report against programme.

Site diaryView template
Cost to Complete Forecast

Forecast the cost to finish from actuals to date and remaining scope.

Earned valueView template
Lookahead Planner (2/4/6 week)

A short interval programme with constraints and predecessor tracking built in.

PlanningView template
RFI / TQ Register

Track every request for information with response deadlines and programme impact.

RegistersView template
Variation / Change Order Tracker

Log and value instructed changes (NEC4) and variations (JCT) as they happen.

CommercialView template
Compensation Event Log Template

Track every NEC4 compensation event from notification to implementation, with the 8 week time bar calculated automatically.

NEC4View template
Construction Project Dashboard

A single page rollup of programme, cost and risk status for the weekly project meeting.

ReportingView template

What's in each template

TemplateCore fieldsBest for
S CurvePlanned vs actual value, cumulative % complete, varianceProgramme reporting, board packs
EVM CalculatorPV, EV, AC, CPI, SPI, EAC, ETCMonthly cost and schedule performance review
Progress ReportWeekly activities, % complete by area, programme varianceClient-facing weekly reporting
Cost to CompleteActuals to date, remaining scope, forecast final costMonthly CVR and forecasting
Lookahead Planner2/4/6 week activities, constraints, predecessorsSite delivery planning meetings
RFI / TQ RegisterReference, description, date raised, response due, programme impactDesign query tracking
Variation TrackerReference, description, value, status, approval dateInstructed change and variation control
CE LogClause 60.1 trigger, notification date, 8 week time bar, quotation statusNEC4 commercial management
Project DashboardProgramme status, cost status, top risks, key actionsWeekly project team meeting

Why project controls slip on paper trackers

Most of these templates fail the same way once a project gets busy: the S curve is only as current as the last time someone updated it by hand, the CE log only shows events someone remembered to notify, and none of them talk to each other, so the dashboard is a manual roll up built from five other spreadsheets the night before the meeting.

That is not a template problem. It is a records problem. Every one of these trackers is downstream of the same site data: diaries, allocations, instructions and correspondence. If that data is captured consistently, the templates populate themselves. If it is not, no amount of formula work fixes the gap.

Nine trackers, one underlying record. Gather keeps them all current automatically.

Gather's AI QS reads your site diaries and correspondence as they land, keeping progress, cost and commercial position aligned to programme without a manual roll up.

See how Gather automates project controls A 30 minute call. No commitment. Bring one of your live projects.
Looking for commercial-only templates? See Construction Commercial Management Templates. Need the site records that feed all of these? See Construction Site Records Templates. Browse the full library at Free QS templates and tools.
Which project controls template should I start with?

Start with the S curve and progress report if you need client-facing reporting, or the EVM calculator and cost to complete forecast if your priority is cost control. The lookahead planner and RFI register sit underneath both.

Do NEC4 and JCT projects need different trackers?

The commercial mechanics differ. NEC4 projects track instructed changes through compensation events, so the CE log is the primary register. JCT projects track variations directly, so the variation tracker does the equivalent job. Both are included in this pack.

Can these templates replace project controls software?

They work well for a single project or a small portfolio kept up to date by one person. They struggle once several people update different sheets, which is when most teams start looking at software that reads the same underlying records automatically.